shopify analytics tool

Dormers Bring in Light & Living Space

thumbnail_IMG_9157_1.jpg

HTR Construction has a fabulous project underway in Arlington, MA where we’ve installed two dormers for our clients that will soon be the home to a master bathroom, a second bathroom and master walk-in closet, as well as a craft room.

For corona virus safety, the second floor is temporarily walled off with a door that keeps the job site separated from the homeowners, as well as staging with stairs to enter the second floor. Hand washing stations, social-distancing and masks are all being implemented on site.

Below is the house before the renovation began.

thumbnail_IMG_9337.jpg

Here, the framing is going up!

IMG_9160.JPG

More light, more space and much better feng shui!

IMG_8740.JPG

The new side dormer.

thumbnail_thumbnail_IMG_8743_1.jpg

 The new front dormer.

thumbnail_thumbnail_IMG_8739.jpg

The front dormer Marvin windows going in.

IMG_9164_1_1.JPG

The side dormer Marvin windows going in.

IMG_8788.JPG

 And below, the new roof and hand split cedar shingles on the exterior. 

thumbnail_thumbnail_20200424_120217.jpg


thumbnail_20200424_120047_opt.jpg

HTR Construction also added a new direct vent boiler and AC system. 

Stay tuned for our interior photo updates to the project!